Notifications
Clear all
Topic starter
17/02/2020 11:18 am
USER MANUAL
Version: All
- Wrong year reference replaced for Chapters:
8.1.7.5 Product Cost
8.1.7.6 Personnel Production Costs
8.1.7.7 Overheads Production
8.1.7.9 Overheads
8.1.7.10 Personnel
from: (same values from January to December 2018)
to: (same values from January to December 2017).
- FIGURE 123 CAPACITY PLANNING RUNNING SHOE 1 - JANUARY 2018.
Shape ‘Assign Machine to Department and to Production Line System’ replaced by ‘Assign Machine to Department and to Production Line System (mandatory)’.
- Chapter ‘VIII. Fix Excel Potential Issues’. Added warning with instructions on how to save the file in Excel.
- Added Chapter ‘Chapter 12 - Start-up and New Business’.
THE PROFITQUBE DEVELOPMENT TEAM
Share: